DOSSIER DEVELOPMENT

In SPYROPOULOS SA we undertake the entire licensing process for the construction of RES stations. In particular, we proceed with the necessary actions of submitting an environmental licensing file and an application file for connection to HEDNO, we undertake the designing, the legal control of documents, as well as finding a suitable plot of land for construction or consulting the client regarding the suitability of an existing plot, accordind to the following criteria:

  • Adequacy of available surface according to the proposed power, suitable slope and orientation
  • Appropriate distance from the medium voltage network, in order to reduce the costs of connection to HEDNO as much as possible
  • Legal and technical completeness regarding the conditions and specifications for the implementation of the construction of the station, in accordance with the current legislation
  • Control and simulation of estimated production as well as shading study of the PV station to be examined.